Home / The cost ABP / Step 2
Step 2: what you actually paid for
A budget written from a blank page is a guess. A budget corrected from a draft is a mandate. Have the agent sort its own typical actions into three lists, then argue with it. The argument is the mandate.
| The objective | Sort what it did into what you asked for, what it decided was needed, and what it would now call waste. Then say what waste means for you. |
| Before this | Step 1: What it has already spent |
| Next | Step 3: Write the cost policy |
| All four steps | The cost walkthrough |
Have it draft the three lists
Draft a cost mandate for yourself, over everything you spend, in three lists.
FREELY things I want you to do without counting: name them
BATCHED things I want you to do, but grouped, or only after telling me the count first:
name them and propose the batch size or the threshold
NEVER things I never want you to spend on without asking me first
Cover at least: writing files, creating new files, committing, pushing, fetching from the
web, searching, spawning subagents, asking me questions, producing documents for me to
read, and opening anything for another person to review.
Put a thing in FREELY only if you can point at something I have said or done that shows I
want it. When unsure, put it in BATCHED. If NEVER is empty you are guessing on my behalf.Now correct it. Move things between the lists out loud and say why. The corrections are the part that is yours.
Then have it say what waste looks like for you
Waste is not generic. For one deployer it is research; for another it is files; for a third it is the review queue. The agent has watched you long enough to know which.
From what you have seen of how I work, tell me what waste looks like for me specifically. Look at: - files you wrote that I deleted, moved or never opened - commits I squashed, reverted or amended - research or summaries you produced that I did not use in the next message - questions you asked that I did not answer, or answered with "just do it" - things you handed me to review that I approved without reading For each, say what it cost in the ledger's units, and propose the one rule that would have prevented it. Then rank the rules by how much they would have saved me, in my time rather than yours.
What the published shapes say
Nothing, which is the finding. Of 16 shapes on this site, 2 grant write.budget.tenant, and none carries a row for a count of any kind, because the grammar has no such row. Every cost mandate on this page is over things the grant cannot express, and that is why step three is a document rather than a permission.
| The objective | Sort what it did into what you asked for, what it decided was needed, and what it would now call waste. Then say what waste means for you. |
| Before this | Step 1: What it has already spent |
| Next | Step 3: Write the cost policy |
| All four steps | The cost walkthrough |